Skip to content
View in the app

A better way to browse. Learn more.

Kings Island Central Forums

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

CP Maverick

Members
  • Joined

  • Last visited

  1. An extra 40 feet in height will need significant reinforcement on the current structure.
  2. There were railroad tracks in the photo.
  3. My concern with current queues is the lack of accurate wait times. If I don't know how long I could be waiting, I can't start planning the next ride until after I exit.
  4. Less time waiting in line is more time to spend money.
  5. I'd estimate about 2/3 finished with the lift hill. The rest should go up pretty quickly. The crossover is the last "tall" part of the ride.
  6. I inquired about sending a resume and they responded with a child t-shirt and a couple pictures.
  7. You mean like Face/Off and then Son of Beast? Different park but, if it happened one place, it can happen elsewhere also1989 Magnum 1990 Disaster Transport (conversion) 1991 Mean Streak Compare to 2015 Rougarou (conversion) 2016 Valravn 2017* RMC MS (conversion) So, it's not completely unheard of...
  8. Well, this one comes to mind... https://firstsliveone.wordpress.com/2010/01/18/cedar-point/
  9. It has been working for me all day. There are some nice pictures posted over at TPR from today.
  10. As the hills get smaller, the crane should be able to reach out further without losing balance. And that's assuming they need it very much before the turn.
  11. So, I found this on Facebook, but I don't know who originated the photo... but I-Box confirmed on site: http://i.imgur.com/lcUlYUl.jpg
  12. Sorry if I misled. I know they are. I was suggesting that someone interested in the development of Mystic Timbers may want to check out the work being done to Mean Streak for themselves.
  13. Be sure to check out the work being done on Mean Streak. Word on the street (in pictures) is that they are attaching steel cross beams to the pre-lift section already.
  14. I'd bet my Platinum pass that it is just a generic crane truck. There's no reason to assume RMC would be on site.
  15. He has stated in interviews that he prefers the smaller rides, because he can do more without worrying about exceeding stress levels. Larger rides require larger pullouts and transitions between design elements.
Background Picker

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.