-
Mean Streak Gets the Axe September 16th
An extra 40 feet in height will need significant reinforcement on the current structure.
-
Cedar Point 2016 Talk
There were railroad tracks in the photo.
-
Improving Que Lines
My concern with current queues is the lack of accurate wait times. If I don't know how long I could be waiting, I can't start planning the next ride until after I exit.
-
Disney's MagicBand vs. Universal's TapuTapu
Less time waiting in line is more time to spend money.
-
Mystic Timbers Construction Progress
I'd estimate about 2/3 finished with the lift hill. The rest should go up pretty quickly. The crossover is the last "tall" part of the ride.
-
Custom Coasters International
I inquired about sending a resume and they responded with a child t-shirt and a couple pictures.
-
Mean Streak Gets the Axe September 16th
You mean like Face/Off and then Son of Beast? Different park but, if it happened one place, it can happen elsewhere also1989 Magnum 1990 Disaster Transport (conversion) 1991 Mean Streak Compare to 2015 Rougarou (conversion) 2016 Valravn 2017* RMC MS (conversion) So, it's not completely unheard of...
-
Mean Streak Gets the Axe September 16th
Well, this one comes to mind... https://firstsliveone.wordpress.com/2010/01/18/cedar-point/
-
Mystic Timbers Construction Progress
It has been working for me all day. There are some nice pictures posted over at TPR from today.
-
Mystic Timbers Construction Progress
As the hills get smaller, the crane should be able to reach out further without losing balance. And that's assuming they need it very much before the turn.
-
Cedar Point 2016 Talk
So, I found this on Facebook, but I don't know who originated the photo... but I-Box confirmed on site: http://i.imgur.com/lcUlYUl.jpg
-
Mystic Timbers Construction Progress
Sorry if I misled. I know they are. I was suggesting that someone interested in the development of Mystic Timbers may want to check out the work being done to Mean Streak for themselves.
-
Mystic Timbers Construction Progress
Be sure to check out the work being done on Mean Streak. Word on the street (in pictures) is that they are attaching steel cross beams to the pre-lift section already.
-
RMC at KI?
I'd bet my Platinum pass that it is just a generic crane truck. There's no reason to assume RMC would be on site.
-
RMC at KI?
He has stated in interviews that he prefers the smaller rides, because he can do more without worrying about exceeding stress levels. Larger rides require larger pullouts and transitions between design elements.