Skip to content
View in the app

A better way to browse. Learn more.

Kings Island Central Forums

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Mystic Timbers Construction Progress

Featured Replies

Does the old Crypt building have a lot of wasp/bee hives or something?  There are a lot of bugs zooming around the camera.  

  • Replies 2.7k
  • Views 554.4k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

Posted Images

That curved drop is looking wicked good! This coaster is going to be such a blast and It's alot of fun watching them put it together on my split screen at work! Those construction workers at the top of the framing right now are braver than me!

The fact that its still highly banked that high makes me think there will be a bit of a snappy transition between the lift leveling off and when the curve starts.

Banshee-esque drop on a GCI woodie?

Yes, please. ^_^

GCI did it first!

 

The fact that its still highly banked that high makes me think there will be a bit of a snappy transition between the lift leveling off and when the curve starts.

Banshee-esque drop on a GCI woodie?

Yes, please. ^_^

GCI did it first!

 

 

And if I know GCI like I think I do, this entire sequence that's built should have some interesting little forces in combination with the obvious forces.  I expect a small pop of air as the bottom banked track unbanks before it goes up the 2nd hill, which should have some impressive air as it crests.

 

 

I can't wait to see how the shaping really turns out.  I maintain that the video doesn't quite show how the track will actually be shaped.  Some of it looked a bit too drawn out for a GCI.  I expect complete insanity from the 2nd drop until the brakes.  

did they get that entire stack erected today? anyone get a pic of that tallest bent going up?

^^ Yes, they are getting closer to topping off the ride at its maximum height.

^ No. There appeared to be one bent left awaiting erection which will likely occur tomorrow morning.

i was really fascinated by the way they hooked up the rigging with the straps...didnt realize the crane had 2 different hooks that work independently.   Learn something cool and new every day.

They placed that last bent this morning.  It seems they are starting to build another, on the ground, in the same spot.

Man, it looks good.

 

The first drop should be fantastic.

Can't wait to ride the train tonight to get an up close look!!!!

They placed that last bent this morning.  It seems they are starting to build another, on the ground, in the same spot.

Man, it looks good.

 

The first drop should be fantastic.

 

 

I think that one on the ground is the one they built last week. Not sure if its a jig, or just the longest one and they are going to leave it there to build on top of so they don't have to keep releveling the last one in the stack every time. 

Looks like they're approaching the top of the first drop.  The top bents are starting to flatten out.  

I was just looking at the webcam a few minutes ago. It's probably just me, but I get a little nervous seeing that crane extended out over the first drop. Hydraulics don't fail me now...ha! Still, it's really amazing how that drop is turning out and alot of fun watching it being built.

Also from that view, you really get a good estimate on how big Diamondback really is!

I think that one on the ground is the one they built last week. Not sure if its a jig, or just the longest one and they are going to leave it there to build on top of so they don't have to keep releveling the last one in the stack every time.

No the one on the ground is new, been watching them all morning

Sent from my iPhone using Tapatalk

 

 

The fact that its still highly banked that high makes me think there will be a bit of a snappy transition between the lift leveling off and when the curve starts.

Banshee-esque drop on a GCI woodie?

Yes, please. ^_^

GCI did it first!

 

 

And if I know GCI like I think I do, this entire sequence that's built should have some interesting little forces in combination with the obvious forces.  I expect a small pop of air as the bottom banked track unbanks before it goes up the 2nd hill, which should have some impressive air as it crests.

 

 

I can't wait to see how the shaping really turns out.  I maintain that the video doesn't quite show how the track will actually be shaped.  Some of it looked a bit too drawn out for a GCI.  I expect complete insanity from the 2nd drop until the brakes.  

 

 

if you look closely, the bottom bank (after the first drop) looks like it has a tiny airtime hill before it climbs into the second big hill.

Really appreciate the screenshots for those of us who can't watch the webcam during the daylight hours!  Keep 'em coming  :D

I noticed back towards WWC's old entrance that they've made more progress on the pre-lift and are also starting the lift ascent.  

The first drop is a beauty.  

Looks like they're about to put up some supports if anyone currently at the park wants to check it out.  Should be happening within the next few minutes (as of this post). 

 

EDIT: Or not. 

95a36931c9.jpg

 

 

 

 Here's a current screen with DB in foreground. First hill is really getting up there.

Those construction boys really hustle on the assembly when they got to work Saturday. Good for them.... 6 days a week about 10 hours a day M-F. That's definately guys that love what they do for a living. As it should be for everyone. That coaster is really looking high quality good, they do very good dedicated work and it shows. 

Hey everyone, I was at the park this weekend and can tell you that the construction progress looks amazing from what I could see from the train. I was dissapointed that I couldn't go through the new vine tunnel to take closer pictures, but it is what it is. From the looks of things, it looks like the lift hill will be topped off this week. I'm also surprised they drained the little lake, but discovered that's where the station will be so that's pretty cool. I would post pictures, but I don't have them uploaded on my hard drive yet. I will get to them tomorrow. ;)

I don`t know what "little lake" you are talking about.  If you are talking about the reservoir/lake next to White Water Canyon, they drain that every off season.  Additionally, they are placing some foundations in that area which necessitated it being drained.  The station is not going in that area.  The station is going about where the former Funnel Cake building once stood.

Majestic

35dfef965374ab81bac2adbb736b4e2f.jpg

Cute little crate

db6c27baae44a8f94ec8bba563268bf2.jpg

They haven't done much else yet with the hill they cleared over by the train engine shed

7449f57410591fc46fba1274dd2d7a71.jpg

New concrete pad leading into the reservoir

2045abcd351fb3dde7793b06f986dc38.jpg

And the one in the middle, and one on the opposite side

0ff3f7f249642e7ba756a913611b6a9c.jpg

Guest
This topic is now closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.
Background Picker

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.