-
Decoding 2020
- Decoding 2020
It's just a big chat room at this point.- Decoding 2020
If thats the case, and it's the big red barn, you might be able to see it from over at KMAA or right next to the old arcade.- Decoding 2020
Try messaging them rather than posting in here maybe?- Decoding 2020
If I would have said that, I'd have been insulted and told to let people have their fantasies. Like others have said, that's just a baby crane. Thats the one to unload track off trucks and build the real cranes.- Decoding 2020
At start it does, but it has a pretty good downslope to it like Leviathan.- Decoding 2020
Here's the post below. He didn't post it on the page, but he did message it to me and others and was correct.- Decoding 2020
MT's name got leaked at the last minute, so it wouldn't be surprising.- Decoding 2020
I wonder if the big box is still up there with a lock on it like yesterdays box?- Canada's Wonderland 2020
25 ft is a lot higher when you are standing on top looking to jump. I did a similar jump at Blue Hole in Jamaica and it gets your heart pounding. Not too many people would jump from higher than that I don't think. That being said, I am surprised they are adding this. It's only a matter of time till someone who thinks they are a bad a.. tries some stupid flip and lands on his neck. I love that they added it and would like one at KI, I just don't know if it'll work in a theme park environment.- Decoding 2020
2014 got to 459. Of course that one had the joy of people looking at footers that were clearly for a B&M Inverted insisting they were for an Intamin Giga. That had to be worth an extra 60 pages of denial.- Decoding 2020
I honestly think that after this ride has been built we will still have people on here saying "but what if the blueprints are fake"- Decoding 2020
If they are guest removable, theres probably a note and/or prize in them.- Decoding 2020
I'd bet against track being installed friday. Even if they get it to the site Friday, they still have to get cranes on site and assembled. Maybe next week they will start, but it may be longer than that. In the video with Chad, it said it looked like someone tried to put it through a shredder.- Decoding 2020
They didn't start vertical construction until the end of September though. This should start a month earlier than that, so an early November topping off is possible. Possibly even before the end of haunt. - Decoding 2020
fryoj
Members
-
Joined
Background Picker