Skip to content
View in the app

A better way to browse. Learn more.

Kings Island Central Forums

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Banshee Construction Progress

Featured Replies

Looks like the first set of a-frame supports, those are some short supports. Looks as if the track will be close to the ground at the bottom of the first drop.

  • Replies 9.1k
  • Views 1.5m
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Guest KingsIslandPR
    Guest KingsIslandPR

    We did not mention all the statistics during the announcement because statistics are not what make a roller coaster great; it's the ride experience it delivers that makes it great.

  • It's good to see me, isn't it? No need to respond! That was rhetorical. Under 30 days until Banshee makes its public debut! We can't wait for you to come out and experience this ride.

  • Guest KingsIslandPR
    Guest KingsIslandPR

    We have guests that are more excited about our live shows than our roller coasters, that visit the park specifically for the shows. For these guests, the Cirque Imagine announcement was as exciting as

This is quite an exciting day. And if you take a pencil, line it parallel to the track before the slope up to the lift (rotate horizontally),

Then angle up to match the lift parallel (angle up),then move your perspective to the side of the pencil. Huzzah! I think the lift is 40*

I'm guessing that the lift hill is as high as it's going to go until the loop around it is finished.

Seeing that they are working on the bottom of the drop, I'm wondering if they will run from there through the dive loop and back to the lift loop so they can still use Clifford. If that's the case I'd think they'd leave the top of the loop off to make the lift track installation easier. After that its finish the lift, top off the loop and start working their way towards the back end of the ride.

I'm guessing that the lift hill is as high as it's going to go until the loop around it is finished.

Seeing that they are working on the bottom of the drop, I'm wondering if they will run from there through the dive loop and back to the lift loop so they can still use Clifford. If that's the case I'd think they'd leave the top of the loop off to make the lift track installation easier. After that its finish the lift, top off the loop and start working their way towards the back end of the ride.

I think you are right....we may see that the first two to three elements completed before the end of the season, at the pace they are moving now...

another piece at the base of the drop is up.....flying right along....

Anyone else notice that the smaller black crane has disappeared?

I wonder where the extra cost is for the ride is coming from. This ride is Banshee is cost the park 2 more million to build than Diamondback yet Banshee is 1,158ft shorter. Has the cost of steel went up that much, design cost more, or trains?

Anyone else notice that the smaller black crane has disappeared?

It's probably hidden behind the trees behind Slingshot.

I wonder where the extra cost is for the ride is coming from. This ride is Banshee is cost the park 2 more million to build than Diamondback yet Banshee is 1,158ft shorter. Has the cost of steel went up that much, design cost more, or trains?

I think the cost is higher because the steel has gone up in the last 4-5 years, and it seems inverts require more steel than a coaster about the same length where the track rests on the supports. Just an observation.

Just a reminder to everyone... If you want to share pictures from the webcam, please save them to your computer and upload them to an image hosting site such as Photobucket, then share the uploaded image here. Otherwise your post makes no sense for those of us who didn't see it when you posted it since the webcam image automatically updates every minute or so.

Just a reminder to everyone... If you want to share pictures from the webcam, please save them to your computer and upload them to an image hosting site such as Photobucket, then share the uploaded image here. Otherwise your post makes no sense for those of us who didn't see it when you posted it since the webcam image automatically updates every minute or so.

*tick* That makes two reminders in this thread, combined with this one. Wonder how many more will be needed before opening day? :P

Ugh...but what if what I want to show you guys in the future... is what my post is pertaining too?

I don't think that reminder does me justice.

Then I would just be showing 'then' while discussing 'now', and my post may make no sense.

my post may make no sense.

Well you got that part right. :-x

Looks like they are starting on the second section of the lift...

Web Cam

*glare* how dare you, HTCO.. haha
I came on at night and since you didn't screen shot, all I see is blackness :(

I'll see it tomorrow anyways.

Weeps.

Sorry ya'll. Didn't have time to screen shot it and edit it and post to photobucket and blah blah, so I just posted a link real quick.

Ugh, as much as I love being in Japan right now it sucks that everytime I go to see the webcam it is dark (13 hour difference)

The other side of that support is going up now and the top A-frame section is already assembled on the ground.

They could easily have the lift and drop done by next weekend.

Going up fast...almost too fast.....almost street carnival fast...

Seems to me that the biggest bottleneck for getting this ride up is how fast track pieces are being produced. Adena always works quickly. Wild Eagle was seemingly put up overnight, as they had loads of track and supports delivered before the bulk of the vertical construction started. I'd imagine you'll see elements put up just about as fast as they can produce the track pieces.

Unlike with Diamondback construction there are very few areas of public access they have to work around. It's going to be awesome to potentially see the lift hill, drop, and the first few inversions from the midways before the season ends!

They have topped off the next support and it is really high! It also looks like a pigeon poo'd on the camera.

Guest
This topic is now closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.
Background Picker

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.