March 25, 201115 yr 7th piece is ready to go? Wow they are moving fast today! Glad to see it, and glad you changed your mind on WindSeeker Angie!
March 25, 201115 yr awesome progress today. I was getting a little worried about them getting it done in time to get testing done but not after today. way to go WS construction crew!
March 25, 201115 yr I just love how we judged a book by its cover negatively at first then positively the past couple of days. Half of the KIC community was mad about WindSeeker when it was announced. Now, we see it again - in real life, and half of us just had to change our pants...... Just sayin', and I'm one of these people^.
March 25, 201115 yr Is it just me or from that angle does it look like the tower is leaning toward the left? Just kidding. This tower will be massive! I actually don't think you are wrong - if you look closely at the picture, the top piece is still connected to the crane. This piece is therefore not yet plum and makes the bottom of the tower "look" like it is leaning left. As I watched the video (at the end) you can hear the people inside the tower banging - it is my assumption they are banging the pieces into alignment (via a connector bar or some built in alignment fixture) before bolting them together. I'm just imagining how loud that must be inside the ride cylinder considering it was pretty loud on the video.
March 26, 201115 yr From that picture, it actually doesn't look that tall, but when you get close to it, it is huge!
March 26, 201115 yr I can confirm as of yesterday at 5:00pm. There was only one tower piece left in the parking lot. Which means the rest are in the park ready to go!
March 26, 201115 yr ...some of them quite literally. Terp, not good at standup comedy (too dry for that he is...a real scorcher anyone?)
March 26, 201115 yr 7th piece is ready to go? Wow they are moving fast today! Glad to see it, and glad you changed your mind on WindSeeker Angie! I just love how we judged a book by its cover negatively at first then positively the past couple of days. Half of the KIC community was mad about WindSeeker when it was announced. Now, we see it again - in real life, and half of us just had to change our pants...... Just sayin', and I'm one of these people^. haha I know right? At first I was thinking........ what in the heck is KI doing?? Then my eyes got wider as I saw the tower getting taller and realized, this isn't just going to be a cracked-out version of Zephyr.. this ride may just have several people in a far more nervous state than they originally thought, especially once they're on the ride.
March 26, 201115 yr Even the smaller version going in at SFSL is going to thrill all but the most jaded of its riders! It's gonna be FUN this summer!
March 26, 201115 yr I know so many people that are crazy excited about the WindSeekers. You should hear kids at the elem school I work at talk about it.
March 26, 201115 yr I can hear the chicken sounds coming from my dad already. Opening day, here I come.....maybe.
March 26, 201115 yr Piece #7 about to be lifted into place I bet it is cold for the guys poking their head out of piece 6 waiting for #7!
March 26, 201115 yr Well, it is far from being completed. They still have to assemble the actual ride vehicle, and get all the electrical work done. Not to mention all the testing. I wonder when we will see the 8th and final piece put on the tower. If that will occur today or on Monday...
March 26, 201115 yr Good question. But yes...as fast as that tower has gone up, there is still so much more that needs to be done. Any word yet on the new park map?
March 26, 201115 yr The eighth and final piece of the WindSeeker tower has arrived on site just a few moments ago, according to the webcam. I wonder if they will put it in place today. Another question I have, is if the workers that are working inside of the tower are climbing up all those stairs inside the tower, or if they are attached a man basket to the crane to get the workers up and down. If they aren`t, those workers are getting quite a workout climbing up all those stairs!
March 26, 201115 yr I can't answer your second question, as I have been wondering the same exact thing. BUT, I believe the eighth piece will be put in place today because the small white lift thing (I'm guessing that isn't the technical name) that lifts the pieces so the yellow crane can pick them up is in position, which is only the case when they are about to lift, from my observations. Can't wait to see the final piece put into place!
March 26, 201115 yr Is the piece that is about to be lifted the last one or is there an all blue piece left?
March 26, 201115 yr That "small white lift thing" is actually another crane. And it doesn`t actually lift the pieces so that the bigger crane can pick them up. When they go to lift the pieces, both cranes attach to the piece, one on each side. Once the yellow crane starts lifting, the other crane swings over while lifting. The whole point of this, is so that when the yellow crane lifts the crane, the other crane is there to lift the piece, and keep it from dragging across the trailer, potentially damaging the piece, and scraping up the paint job.That is the eighth and final piece. There will likely be the red top, piece, as seen in the renderings, assuming that the top of the ride hasn`t changes since the renderings were made...
March 26, 201115 yr I can't believe how quickly they got this completed. Makes me even more excited about opening day
March 26, 201115 yr When the tower is toped off, will that crew move on to Sandusky and start the Cp erection Pun intended? I mean that nothing is happening at Cp and I believe the Ki crew will turn the Ki tower over to electricians and another crew that will finish the ride. I have seen crew ride in a basket on the crane to the top of the tower. Ps; there goes the next to last piece to the top.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.