Skip to content
View in the app

A better way to browse. Learn more.

Kings Island Central Forums

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Diamondback Construction Thread (Updated 3-19-09)

Featured Replies

From what I have seen on the web cam definately looks like Clifford will be leaving the site. Looks like the boom has completely been disassembled.

Also the pullout of the 2nd hill and curve in to the 3rd looks like it could be an insane head chopper at high speed, where it crosses under the MCBR drop.

  • Replies 7.5k
  • Views 1.1m
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Fear the Offseason
    Fear the Offseason

    Hey everybody! This is my first post! I was so happy when I saw them putting that first piece of track in place! woo! LOVE IT!

  • Ok if Diamondback's doesn't look like those, then here you go. DB HammerHead Nitro HammerHead SilverStar HammerHead Behemoth HammerHead Behemoth Layout Depiction of HammerHead

  • The Interpreter
    The Interpreter

    Any discussion that results in me looking at pictures of Nitro is one I am in favor of! And in saying that, I am on sound footing! Terpy, whose sign off line could be called a footer

Posted Images

Yea this ride is going to be amazing. Head choppers some close to the ground parts. Great amount of airtime. Good height and lenght. All the great things a coaster needs.

Can someone put one of those things that show the progress of the track and supports as of now. I just got home from basketball and can't tell whats done.

HAHAHA ^ Thats pretty cool. Now its all up to Casper

Sorry but I think Casper is gone as well. I think he was only needed to complete the 1st and 2nd hills.

Looks like we're down to the scattered normal cranes. You know, the Telescoping ones that installed the first track pieces way back in August?

Yes the ones that do the majority of the lifting and grunt work, but dont receive the glory or praise of a crane like Clifford. Size does matter, especially when talking cranes...

....Not fast enough.....

Jackson, who while he enjoys things like Christmas and Snow and all other things wintery and good, sees April as one of the best months of the year, with the anticipation and opening day, and my birthday!

I think it will seem slow at the beginning but feel that it has gone by fast by the end. This almost 200 page so far thread will be a small memory of the past. But, I'd sure rather have Diamondback in real life than experiencing a thread about the topic in real life! Only 129 more days!

By my count it's 16 days.......

Jackson, who sometimes likes to take life one step at a time, and other times looks forward to amazing lengths, and commonly enjoys philosophizing...

I emailed Don another question for the blog and got an AutoReply saying:

I am currently out of the office until Monday, December 15, 2008. I will respond to your e-mail upon my return.

Thanks,

Don Helbig

So I doubt we'll get blog updates for a while.

I just watched Shiekra and Griffon's water brakes. Is there any chance that Diamondback's spray is going to be as big as theirs? It seems that those two coasters are really coming into the water brake at a high rate of speed, and after coming out of that last helix, it doesn't seem to me that DB would be carrying the same amount of speed. What do the experts think?

Much depends on the size and shape of the train mounted scoops that lift up the water...Whatever it is that B & M and Cedar Fair's Kings Island wished to achieve with those scoops almost certainly will be achieved.

They're placing lots of track behind the final helix, on the left side of the Crypt.

Fear not

April is coming! :)

...unless you happen to be turning 40 in April. :o

-Tb, who knows it's the new 20...

They're placing lots of track behind the final helix, on the left side of the Crypt.

Im not sure if that is track or if that is Cliffords boom disassembled and ready for loading. The sections look to be very open which tends me to think its the latice work on the boom and not the box spine of the track.

I bet your right, I thought it was track cuz I saw an empty flatbed leaving there. But there's no support work done and they're doing supports in the back half. I'm surprised your resolution is clear enough to see that it's the boom though, I just see red fuzz.

I'm now jealous that maybe everyone else hase a clearer view than I.

No my resolution is not that clear, but the structures dont look solid enough even with poor resolution to be track. That why I am guessing its Clifford boom. The pieces seem to be open where they B&M box spine should be, but like you said the resolution makes it hard.

The station roof is completly on now! Woohoo!

Well besides the details of course!

Yeah, I'm pretty sure thats Clifford not track.

Its nice to see you again Clifford... :unsure:

This is the dreariest looking day of construction I've seen so far. It looks very muddy.

Yes, I do believe that Clifford`s work on Diamondback is not yet done. Likely, the crane could not safely crawl down in the valley and make it up to the other side, so in order to get the crane to where they needed it, they had to take it apart and move it piece by piece. Additionally, they might not have wanted to roll the entire crane over the new asphalt maintenance path for fear of damaging that path and having to replace it.

Yes, I do believe that Clifford`s work on Diamondback is not yet done. Likely, the crane could not safely crawl down in the valley and make it up to the other side, so in order to get the crane to where they needed it, they had to take it apart and move it piece by piece. Additionally, they might not have wanted to roll the entire crane over the new asphalt maintenance path for fear of damaging that path and having to replace it.

yea i was thinking that to :blink:

Yes, I do believe that Clifford`s work on Diamondback is not yet done. Likely, the crane could not safely crawl down in the valley and make it up to the other side, so in order to get the crane to where they needed it, they had to take it apart and move it piece by piece. Additionally, they might not have wanted to roll the entire crane over the new asphalt maintenance path for fear of damaging that path and having to replace it.

I would say you are right about being able to manuver through the valley with the full boom attached, but I dont see removing the boom being able to protect the path. After all it is the crawler tracks and the shear weight of the cabin that would damage the path. The boom while very sturdy is made to be as light weight as possible, so I would say that the crawlers would still damage the path even without the boom.

Guest
This topic is now closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.
Background Picker

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.