Everything posted by pkiknex25
-
Orion Construction Photos
Good spotting! This morning: Today, around noon:
-
Orion Construction Photos
- Orion Construction Photos
It's the last lift support, then as FloppyDisc said, one more support for the drop. Hopefully they get the next track segment up this afternoon! After this next lift segment, we should see them start building up backwards on the drop. Only after that can the top it off.- Orion Construction Photos
From King's Island Facebook:- Orion Construction Photos
Not my picture, not my Istagram account.- Orion Construction Photos
To further clarify, the first lift support (in sequence) is below the treeline.- Discussing Land and Space in and around Vortex
^ Nitro at Adlabs Imagica in India in 2013. Though Rougarou and CGA Patriot have been converted from stand up to floorless since then.- Vortex Is Leaving After This Fall Season
Do you have any non-emotional logic to back that claim up?- Vortex Is Leaving After This Fall Season
EDIT: Nevermind, McSalsa explained it nicely.- Vortex Is Leaving After This Fall Season
It's not all about uptime vs downtime. Like I mention before, how about steel integrity in the track and supports?- Vortex Is Leaving After This Fall Season
But who is to say that Vortex could safely operate for a few more years? Surely not us.- Vortex Is Leaving After This Fall Season
Just to try to get some logic mixed in with the raw emotion right now: Vortex is over 32 years old, and stressed materials break down with time and repetition. Now I know that older Arrows are still operating, but no one coaster is the same as any other, especially from an age where computers weren't used in design yet. The reason that Universal had to rebuild Hulk and remove Dragons was because the integrity of the track and supports was beginning to fail with 20ish years of near daily operations, and that was with computer assisted design. For a more apples to apples comparison, Vortex significantly outlived SFGAm Shockwave and SFGAdv Great American Scream Machine, plus still has 3 years on SFMM Viper and 4 years on Anaconda. To combine some thoughts, after removing Firehawk last year, I think KI wasn't exactly sure how much longer Vortex, but had to take a gamble on it. KI wanted to build its giga, and Vortex's land isn't suitable for it. I'm repeating myself here, but I think something came up recently after KI already committed to Orion. That's the only logic I can see that results in two coasters being removed in consecutive years. The timing is very unfortunate, but risk management is a continuous gamble in the business world, and I can't and won't blame KI on the decisions they have made.- Vortex Is Leaving After This Fall Season
And this is why I think that losing Firehawk and Vortex in back to back years wasn't planned by KI and CF. Firehawk clearly was, but something had to have come up on Vortex recently.- Vortex Is Leaving After This Fall Season
Either this was a short notice decision with something coming up in the downtime since daily operations ended, or they want to keep the focus on Orion, or they don't want the focus on it since there's no short term replacement.- Orion Construction Photos
Late on this topic, but per the blueprints scanned and uploaded by @Bansheeback, there are 122 "normal" track pieces, 16 lift and drop structure, 9 brakes and station, and 1 for the transfer. That adds up to 148 pieces of track.- Kings Island 2019 Discussion
Does anybody know what's going on with Diamondback right now? It's been closed for a good chunk of yesterday and today.- Decoding 2020
Flight of Fear got changed from Sequence 5 to Sequence 7. (I think yesterday?)- Decoding 2020
Yukon Striker carries your stuff from the entrance side of the station to the exit side, with the bins on a conveyor belt crossing over the track. There's no stepping across the train required.- Decoding 2020
The water fountain is on the exit side of the station, so no. I think it's simply for employee use.- Decoding 2020
Maybe they figured out the logistics of construction and concluded that they need this area as a path for equipment.- Decoding 2020
According to the blueprints, L16 is the base of the spine on the drop-side.- Decoding 2020
Yeah, SeaWorld San Diego has already confirmed a B&M dive coaster. It'll be the smaller 6-seats across with normal size track model. Regardless of where it goes though, that's a pretty color.- Decoding 2020
Is it possible that he's just a business guru with little knowledge of the engineering field?- Decoding 2020
Not exactly new. It came from the demolished Stinger at Dorney Park.- Decoding 2020
Our turnaround does look similar to Leviathan's hammerhead from the top angle, but the top point of ours is about 90 degrees away from Leviathan's, which is almost perfectly centered. I think our turnaround is something different. - Orion Construction Photos