Everything posted by TOPGUN1993
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
-
Going to Carowinds this summer - ride suggestions?
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Must see drop tower video (not the one at Kings Island)
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
Not sure exactly what year but Beast also had a car increase from Four - 4 Bench Cars too Five - 4 Bench Cars. Increasing the capacity from 32 riders per train to 40 riders per train. And after that the trains were changed to Six - 3 Bench Cars, Capacity was and to this day is 36 riders per train. The Beast opened in 1979 with five 4-bench cars. In 1980, it was changed to the current six 3-bench cars. That same year, banking was enhanced going into and out of the shed and walls were added to the helix. There were originally four trains when the ride opened, with three of them in operation on a daily basis. In 1982, the fourth train was eliminated and used for parts. So?- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
Not sure exactly what year but Beast also had a car increase from Four - 4 Bench Cars too Five - 4 Bench Cars. Increasing the capacity from 32 riders per train to 40 riders per train. And after that the trains were changed to Six - 3 Bench Cars, Capacity was and to this day is 36 riders per train.- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Flashback Till Opening Day 2012
- Greg Scheid on Twitter
"What a Day"- Greg Scheid on Twitter
Your right it has been 10 years since the last poster map.
Background Picker