July 13Jul 13 Maybe I’m tardy to the party but while riding WindSeeker today, I saw some structural work being done to a part of the backstage area outside of Area 72 near Orion.
July 13Jul 13 You are late to the party. Everyone knows that is the first stage of construction for Step Sister of Bavarian Beetle!
July 13Jul 13 I thought it looked like a new roof to cover some equipment. Knowing what's stored in the giant tank next door and/or the building on the other side could be a clue.
July 14Jul 14 I think the construction might be for a new PFAS filtration system given that it’s right next to the water tank. The park filed a permit a while back to install a new PFAS filtration system, which makes sense since Kings Island was recently found to have high levels of forever chemicals in its water. The article below is behind a paywall, but it reveals that Kings Island was found to have levels of forever chemicals in its water 6.3x federal guidelines. https://www.cincinnati.com/story/news/2025/08/21/are-there-forever-chemicals-cincinnati-water-see-map/85706338007/?gnt-cfr=1&gca-cat=p&gca-uir=true&gca-epti=z1177xxp000150c000150e1177xxv003748d--60--b--60--&gca-ft=178&gca-ds=sophi
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.