Skip to content
View in the app

A better way to browse. Learn more.

Kings Island Central Forums

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Orion Construction Photos

Featured Replies

Well they don't move The Beast when fireworks go off, so I doubt that is the issue. 

 

I would assume it will close due to the location unfortunately. 

  • Replies 7.7k
  • Views 1.5m
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • sixohdieselrage
    sixohdieselrage

    Here are my pics from yesterday. Didnt take any professional camera up. Just with my S9+. Plus, was a little bumpy. Watermarked because some people. And these definitely are "exclusive". 

  • Why wait?

  • Enchanted Voyage Lover
    Enchanted Voyage Lover

    ...

Posted Images

Some very high quality photos here of the new construction today: 

 

25 minutes ago, KI FANATIC 37 said:

Well they don't move The Beast when fireworks go off, so I doubt that is the issue. 

 

I would assume it will close due to the location unfortunately. 

Wow I’m dumb

52 minutes ago, KIghostguy said:

Some very high quality photos here of the new construction today: 

 

Am I missing something?? I don't see any high quality photos here...

5 minutes ago, CedarIslander said:

Am I missing something?? I don't see any high quality photos here...

It’s showing up fine on my phone.

Wow I’m dumb


You’re not. There’s a standoff distance listed in the Fire Code as well as the NFPA 1123 guide for fireworks. It depends upon the size of the shell used as to how far the minimum distance is that the “crowd” can be. Anything closer or in close proximity must be shut down during the fireworks display and 20 minute “cool down” after the display is over.

They could always move the launching location elsewhere...
8 minutes ago, KIghostguy said:

It’s showing up fine on my phone.

My phone, tablet, and laptop are all showing an error.

6 minutes ago, CedarIslander said:

My phone, tablet, and laptop are all showing an error.

It's showing on my phone, but not my computer. I have a Samsung, maybe that has something to do with it?

49 minutes ago, collin.klopfstein said:

Wow I’m dumb

I didn't mean that bad at all! :lol:

9 minutes ago, Kodistict said:

It's showing on my phone, but not my computer. I have a Samsung, maybe that has something to do with it?

Hmmm... I don't know. Can someone try PMing me the photos, see if I can get them that way?

58 minutes ago, collin.klopfstein said:

Wow I’m dumb

Not at all! That was a logical counterargument.

But yeah, I was mainly thinking about proximity to the fireworks. Fireworks debris could be an issue. Or, similar to what @fyrfyter said, perhaps there are codes or laws regarding proximity to fireworks that they have to follow.

I'm guessing the crews don't usually do much on the weekends because I didn't really see them do much on the weekends. 

1 minute ago, collin.klopfstein said:

Apperently this is at Cedar Point ...... wow

757ED42A-D696-4DA6-B608-CE4AA810D02D.png

Millennium Force is 310 feet tall lol. 

6 minutes ago, collin.klopfstein said:

Apperently this is at Cedar Point ...... wow

757ED42A-D696-4DA6-B608-CE4AA810D02D.png

But Millennium Force isn't 312 feet. lol

But Millennium Force isn't 312 feet. lol


Maybe there’s a flag on the lift hill... :lol: maybe KIO needs a 30 foot flag on the lift hill...hmm
3 minutes ago, Hawaiian Coasters 325 said:

Crane looks to be getting ready to move another brake run piece

I don't believe they're ready to install any more track yet.  There are no more supports installed at the moment.

Just now, LovinMeSomeBanshee said:

I don't believe they're ready to install any more track yet.  There are no more supports installed at the moment.

It was at the piece getting it ready, but it moved away from it. 

I think they are actually bringing up other metal for the station building. Its hard to spot the crane doing it because they are smaller pieces and gray lol

The white crane is working on the station / storage shed. From watching the cam ever day I have yet to see white crane touch track?  Its hard to spot but each time white goes over near track they end up with a small piece of metal for the shed/station. If we see yellow come back over we might see more supports or track go up! At least from what I've seen thus far on the cam.

8 minutes ago, Maverick44 said:

The white crane is working on the station / storage shed. From watching the cam ever day I have yet to see white crane touch track?  Its hard to spot but each time white goes over near track they end up with a small piece of metal for the shed/station. If we see yellow come back over we might see more supports or track go up! At least from what I've seen thus far on the cam.

Yep, I believe only the yellow crane has actually been used to move track.

15 minutes ago, Hawaiian Coasters 325 said:

I think they just moved over the transfer track piece and now it's connected with the other track!

I didn't get to see it - when it slid over, did it do it by itself (mechanically, like with normal operation) or with help by a crane?  

Yeah transfer track seems to be now over with the rest of the track while they work on other parts of the shed / transfer.

42 minutes ago, Maverick44 said:

The white crane is working on the station / storage shed. From watching the cam ever day I have yet to see white crane touch track?  Its hard to spot but each time white goes over near track they end up with a small piece of metal for the shed/station. If we see yellow come back over we might see more supports or track go up! At least from what I've seen thus far on the cam.

I'm pretty sure they used the white crane moved the trasnfer track into place if I'm not mistaken.

2 minutes ago, Klabergian Empire said:

I'm pretty sure they used the white crane moved the trasnfer track into place if I'm not mistaken.

That you are correct. I guess i forgot about that. As for the rest of the installed track so far its been yellow crane. The past few days the white one has been working on station / shed area with small metal movement.

Guest
This topic is now closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.
Background Picker

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.