Skip to content
View in the app

A better way to browse. Learn more.

Kings Island Central Forums

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Banshee Construction Progress

Featured Replies

I wonder what that random wall by the stairs will be for... :huh:

  • Replies 9.1k
  • Views 1.5m
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Guest KingsIslandPR
    Guest KingsIslandPR

    We did not mention all the statistics during the announcement because statistics are not what make a roller coaster great; it's the ride experience it delivers that makes it great.

  • It's good to see me, isn't it? No need to respond! That was rhetorical. Under 30 days until Banshee makes its public debut! We can't wait for you to come out and experience this ride.

  • Guest KingsIslandPR
    Guest KingsIslandPR

    We have guests that are more excited about our live shows than our roller coasters, that visit the park specifically for the shows. For these guests, the Cirque Imagine announcement was as exciting as

I find it interesting that the trains sit on the wheels in the storage shed. Doesn't B&M have a different set of wheels for the train to sit on in the storage shed on other their other types of coasters (see Diamondback)? When Diamondback was built, it was mentioned that it was done to prevent flat spot/lumps in the wheels from sitting in one spot each night, thus causing a bumpier ride and necessitating wheel changes more often. Not that I don't trust B&M, but what makes an inverted train and its wheels different than their other types of rides?

*Edit*

I just realized that those are actually a different set of wheels, and not the running wheels. My bad, it's early in the morning! :rolleyes:

^^They already said they wouldnt...you missed an old memo mate .

Btw some die hard enthusiasts are driving me insane..

They see one car on the train and immediately think OMG testing soon...le sigh..we got lot more to do first

Ok, so for us who are ignorant to the process, what kind of time frame can we expect there to be before they start testing?

^^Maint & stuff will go first, but ride ops getting to the ride early April for training & stuff. One guy I saw got Banshee's crew is going in I think it was 06APR. I'd have to check FB but I can't atm to get when he was inprocessing. Few people have gotten their ride placement emails for returners. One person on Eiffel Tower got her placement already Lindz said. Few other returners still waiting.

I just made the point because them getting their positions probably plays little to no role in when the initial testing begins.

http://rcdb.com/2536.htm?p=11181

I find it interesting that the trains sit on the wheels in the storage shed. Doesn't B&M have a different set of wheels for the train to sit on in the storage shed on other their other types of coasters (see Diamondback)? When Diamondback was built, it was mentioned that it was done to prevent flat spot/lumps in the wheels from sitting in one spot each night, thus causing a bumpier ride and necessitating wheel changes more often. Not that I don't trust B&M, but what makes an inverted train and its wheels different than their other types of rides?

*Edit*

I just realized that those are actually a different set of wheels, and not the running wheels. My bad, it's early in the morning! :rolleyes:

I am pretty sure that the running wheels are clear of the rails and that the cars actuallyhang on the set of wheels just above the riders heads that sit on the catwalks.

Indeed, though. Going from the renderings, it looks like the trains will have tacky looking wheels just floating on the side, or the crews will have to put on the side covers that are featured in the renderings.

http://rcdb.com/2536.htm?p=11181

I find it interesting that the trains sit on the wheels in the storage shed. Doesn't B&M have a different set of wheels for the train to sit on in the storage shed on other their other types of coasters (see Diamondback)? When Diamondback was built, it was mentioned that it was done to prevent flat spot/lumps in the wheels from sitting in one spot each night, thus causing a bumpier ride and necessitating wheel changes more often. Not that I don't trust B&M, but what makes an inverted train and its wheels different than their other types of rides?

*Edit*

I just realized that those are actually a different set of wheels, and not the running wheels. My bad, it's early in the morning! :rolleyes:

I am pretty sure that the running wheels are clear of the rails and that the cars actuallyhang on the set of wheels just above the riders heads that sit on the catwalks.

Indeed, though. Going from the renderings, it looks like the trains will have tacky looking wheels just floating on the side, or the crews will have to put on the side covers that are featured in the renderings.

You both are correct. I realized it just after I posted and immediately edited my post. You can see the ride wheels in the picture of the original train delivery, and they are clearly different than the wheels that it sits on in the storage shed. It also does appear the wheel covers will cover the "storage shed wheels." Having said that, it seems kind of odd/inefficient that they have to remove and put those on each day. Maybe it's just me. I'm sure it's the same way on at least all newer inverts...just not something I thought of I guess.

I just made the point because them getting their positions probably plays little to no role in when the initial testing begins.

You are correct. Operations are generally at the end of the line when it comes to whats important out in the field when a new coaster is being built.

I even stated that..First five words..But apparently crews are arriving early APR for training, so I'm assuming right before then Maint & supervision will get it going.

Yes but in your initial post you made it seem as if they needed to be placed before the ride began testing.

They haven't even placed all ride op positions yet, only a few people have gotten their emails so far

Oh yeah no...Lol lets send ride ops there when they haven't even finished building the station, electrical, etc. lol Hell no..

We don't even have all three trains to get it going and testing yet, just one car so far, whole train isn't even put together yet

If I am not mistaken, when they do first start testing. The very first run is done with ropes and cables and pulleys. They pull the train all the way through the track that way first to make sure there are no "hang ups". And if that goes well, then they start running the cars through normally. I could be wrong. But I think that's probably how they will do it.

Speaking of containers shipping trains. What do you think the shipping bill is on the trains? Something interesting to think about.

I wonder if the video playing in the que line will be the work of Ryan, ala Diamondback? ;)

I doubt they'd do a pull through for this ride. Honestly, there are easier, cheaper, and faster ways to get those checks done.

The last ride I personally remember having a pull through with the actual train was Maverick. Different company, different ride, different time.

If I am not mistaken, when they do first start testing. The very first run is done with ropes and cables and pulleys. They pull the train all the way through the track that way first to make sure there are no "hang ups". And if that goes well, then they start running the cars through normally. I could be wrong. But I think that's probably how they will do it.

I dont think they will do that. I dont think they ever do it on an Invert Let Alone Any looping Coaster. That Just be to hard to pull through the track. I know they did the pull through on the Seven Dwarfs Mine Train Over at Magic Kingdom. I may be wrong, But I Think Once All The Trains Were On Diamondback`s Track, They Started Testing.

Skyrush had a pull-through just a couple years ago. But B&Ms don't seem to require them anymore.

I wonder what that random wall by the stairs will be for... :huh:

I believe it is a place to view your photos when you get off.

^ That's what I was expecting, but there's no evidence to suggest that, that I've seen.

Although, I'd imagine doing that would create a little congestion on the stairway down, so maybe the wall can only be a decorative architecture.
Kinda how it suggests the steeple portion of a church without building an extra section of building.

I wonder what that random wall by the stairs will be for... :huh:

I believe it is a place to view your photos when you get off.

I think the on ride photo booth will be under the station along with the gift shop. As someone said earlier, the wall could just hide the maintenance shed behind Banshee.

Good point. I mean everyone will be just standing their in the way of other people who don't want a ride photo,

Remember the wall may never be built as the renderings are not final

Sent from my SAMSUNG-SGH-I547 using Tapatalk

Speaking of containers shipping trains. What do you think the shipping bill is on the trains? Something interesting to think about.

I've always wondered how the $20+ Million is spread out. How much of that goes to B&M? To ADENA? To the steel manufacturing plant? To shipping? To the design firm of the station, etc...? Always thought it would be cool to see that layed out on a piechart.

^ That picture is taken in the backside of the station, and the entrance stairs are coming up from the back. If my hypothesis is correct, you will enter the station by going around to the back of the station, allowing for a great view of the back half of the ride. :) Looks like we'll have even more to look at while waiting in line.

So one set of stairs for the main line and a set of stairs for Fast Lane is what it looks like to me? Am I correct?

Guest
This topic is now closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.
Background Picker

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.